Process approach in life cycle management of weapons and military equipment on the basis of program and project management

Authors
Keywords:
Array, Array
Abstract

The article analyzed the shortcomings of the domestic lifecycle management system, which are characterized by the lack of full coverage of the entire life cycle, imperfect infrastructure, presence of long bureaucratic chains, low level of IT application, lack of unified information environment and others.
The U.S. approaches to applying the methodology of programme and project management in the context of managing the entire life cycle of weapons and military equipment has been considered. The main advantages of the approaches are next: reducing risks and cost of entire life cycle, increasing the availability and reliability of the armaments samples, reducing time of been the system of interest at the stages of concept, development, production, support and disposal.
The U.S. life cycle model of weapons and military equipment has been presented, the advantages of using Programme (project) management for coordination activities among all stakeholders from customer side have been defined, the regulatory basis of the life cycle management system used in NATO including system engineering standardsn has been classified, the application of a process approach for coordinated life cycle procedures, effective resource management, wide IT using as a critical element of the modern lifecycle process management system have been researched.

Author Biographies
  1. Igor Chepkov, Central Scientific Research Institute of Armament and Military Equipment of the Armed Forces of Ukraine

    Doctor of Technical Sciences, Professor

    Chief of Central Scientific Research Institute of Armament and Military Equipment of Armed Forces of Ukraine

    Kyiv, Ukraine

  2. Ivan Oliynik, Central Scientific Research Institute of Armament and Military Equipment of the Armed Forces of Ukraine

    Doctor of Technical Sciences, Senior research fellow

    Lead researcher of Central Scientific Research Institute of Armament and Military Equipment of Armed Forces of Ukraine

    Kyiv, Ukraine

  3. Serhii Korobchenko, Central Scientific Research Institute of Armament and Military Equipment of the Armed Forces of Ukraine

    Candidat of Technical Sciences PhD

    Lead researcher of Central Scientific Research Institute of Armament and Military Equipment of Armed Forces of Ukraine

    Kyiv, Ukraine

References

Military doctrine of Ukraine. Decree of the President of Ukraine No. 555/2015 of 24 September 2015. Available at: http://www.zakon3.rada.gov.ua/laws/show/555/2015.

Strategic Defense Bull. of Ukraine-2016. Decree of the President of Ukraine No. 240/2016 of 06.06.2016. Available at: http://www.zakon0.rada.gov.ua/laws/show/paran16#n16.

Annual National Nato−Ukraine Cooperation Program for 2016, approved by the Decree of the President of Ukraine No. 45/2016 of 12 February 2016.

State Standard of Ukraine (2017), “V-P 15.203:2017 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Vykonannia DKR zi stvorennia vyrobiv ta ichnikh skladnykiv. Osnovni polozhennia” [V-P 15.203:2017 System of development and launching into manufacture of armament and military equipment. Execution of research and development work on creation of items and its components. Main provisions], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2017), “V-P 15.501:2017 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Dokymenty ekspluatatsiini i remontni na ozbroennia ta viiskovu tekhniku. Zagalni vymogy do nomenklatury, pobudovy, zmistu, vykladennia, vydannia ta koryguvannia. Chynnyi vid 2019-01-01 do 2022-01-01”. [V-P 15.501:2017 System of development and launching into manufacture of armament and military equipment. Exploitational and repair documents for armament and military equipment. Main requirements for nomenclature, construction content, statements, publication and editing. Valid from 2019-01-01 till 2022-01-01], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2018), “V-P 15.001:2018 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Osnovni polozhennia. Chynnyi vid 2019-09-01 do 2022-09-01” [V-P 15.001:2018 System of development and launching into manufacture of armament and military equipment. Main provisions. Valid from 2019-09-01 till 2022-09-01], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2018), “V-P 15.601:2018 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Remontni dоkumenty na ozbroyennia ta viiskovu tekhniku. Pravyla rozroblennia. Chynnyi vid 2019-09-01 do 2022-09-01” [V-P 15.601:2018 System of development and launching into manufacture of armament and military equipment. Repair documents for armament and military equipment. Rules for development. Valid from 2019-09-01 till 2022-09-01], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2019), “V-P 15.004:2019 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Stadii zhyttyevogo tsyklu. Chynnyi vid 2020-10-01 do 2023-10-01” [V-P 15.004:2019 System of development and launching into manufacture of armament and military equipment. Stages of the life cycle. Valid from 2020-10-01 till 2023-10-01], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2019), “V-P 15.701:2019 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Biuleteni zmin ta vykonannia za nymy robit. Osnovni polozhennia. Chynnyi vid 2021-10-01 do 2023-10-01” [System of development and launching into manufacture of armament and military equipment. Ballots of changes and execution of works therein. Main provisions. Valid from 2021-10-01 till 2023-10-01], K.: DP “UkrNDNTs”.

State Standard of Ukraine (2019), “V-P 15.005:2019 Systema rozroblennia i postavlennia na vyrobnytstvo ozbroennia ta viiskovoi techniky. Ustanovlennia ta prodovzhennia stroku dii pryznachenykh pokaznykiv. Osnovni Polozhennia. Chynnyi vid 2020-10-01 do 2024-10-01” [V-P 15.005:2019 System of development and launching into manufacture of armament and military equipment. Integrated logistic support on life cycle stages of armament and military equipment. Main provisions. Valid from 2020-10-01 till 2024-10-01], K.: DP “UkrNDNTs”.

INCOSE, Systems engineering handbook: a guide for system life cycle processes and activities. Ver. 4.0. Hoboken, NJ, USA: John Wiley and Sons, Inc.

Sharon, A., O. L. de Weck & Dori, D. Project management vs. systems engineering management: a practitioners’ view on integrating the project and product domains. Systems Engineering. Vol. 14. 2011. Pp. 427—440.

Becker, J. & Kahn, D. (2003). The Process in Focus. Process Management: A Guide for the Design of Business Processes. Berlin Heidelberg: Springer-Verlag.

Papulova, Z., Papula, J. & Gazova, A. (2016). The application of concepts and methods based on process approach to increase business process efficiency. Proc. Economics and Finance. Vol. 39. Pp. 197—205.

Skrinjar, R. & Trkman, P. (2013). Increasing process orientation with business process management: Critical practices. Intern. J. of Information Management. Vol. 33:1. Pp. 48—60.

Hammer, M. & Champy, J. (1993). Reengineering the corporation. A Manifesto For Business Revolution. New York: Harper Business Books.

Lusk, S., Paley, S. & Spanyi, A. (2005). The Evolution of Business Process Management as a Professional Discipline. BPTrends. Pp. 1—9.

A guide to the project management body of knowledge (PMBOK guide). Sixth edition. Newtown Square, PA: Project Management Inst. 2017.

PRINCE2 ™. A Practical Handbook. Third edition. Colin Bentley.

“Маterialy seminary z upravlinnia ZhTs. Grypa Yriadovykh radnykiv z pytan oborony ta menedzhmentu SShA (Defense Governance and Management Team)ˮ. [Proc. of the seminar on life cycle management. A group of US government defense and management], Маkkartni, М. (27-29.08.2018).

Defense Acquisition Guidebook. Available at: https://www.dau.edu/tools/dag.

NATO PUBLICATION AAP-48. NATO System life cycle processes.

DSTU ISO 9001:2015 Quality Management Systems. Requirements (ISO 9001:2015, IDT).

NATO PUBLICATION AAP-20. NATO Programme management framework (NATO Life Cycle Model).

Korobchenko, S.O. (2019), “Protses otsinky vytrat za proyektamy v NASAˮ. [Project cost estimation process at NASA]. K.: Weapons and military equipment. № 4. Pp. 3—11. DOI: https://doi.org/10.34169/2414-0651.2019.4(24).3-11.

Strategic Defence Bull. of Ukraine − 2021. Decree of the President of Ukraine No. 473/2021 of September 17, 2021. Available at: https://www.president.gov.ua/documents/4732021-40121.

Cover Image
Published
2021-12-26
Section
MILITARY TECHNICAL POLICY
License

Copyright (c) 2021 Igor Chepkov, Ivan Oliynik, Serhii Korobchenko (Author)

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How to Cite

Process approach in life cycle management of weapons and military equipment on the basis of program and project management. (2021). Weapons and Military Equipment, 32(4), 3-11. https://doi.org/10.34169/2414-0651.2021.4(32).3-11

Most read articles by the same author(s)